• Home
  • What should I carry out if clear plastic injection molding is unfinished?

What should I carry out if clear plastic injection molding is unfinished?

   This is a frequently encountered problem, but it is also relatively easy to solve. When it is really not solved by technological means, it can be improved from the design and manufacture of molds, which can generally be solved.

1 . Equipment:

(1) The capacity of the injection molding machine is small. When the quality from the product exceeds the actual maximum injection quality of the injection molding machine, it is obvious that the amount of material supplied will not make ends meet. If the top quality of the product is close to the actual injection quality of the shot molding equipment, there is a problem of insufficient plasticization. The heating time of the material in the barrel is usually insufficient. As a result, the appropriate melt cannot be provided to the Cnc Machining mold in time. In this case, the problem can only become solved by replacing the injection molding machine with a large capacity. Some plastics such as nylon (especially synthetic 66) have a narrow melting range and a large specific heat. An injection molding machine having a large plasticizing capacity is required to ensure the supply of materials.

(2) The temperature displayed by the thermometer is not true, the bright high is definitely low, and the material temperature is too low. This is because the temperature control device such as thermocouple and its wiring or the temperature difference millivoltmeter fails, or because the heating coil far away from the heat measurement point is aging or burned, heating failure has not been found or has not been repaired and replaced with time.

(3) The diameter in the inner hole of the cnc turning nozzle is too large or perhaps too small. If it is too small , due to the small flow diameter, the specific volume of the strip will increase, which will easily be cooled, block the feed channel or consume the injections pressure; The condition of low force. At the same time, plastic materials such as uhmw machining cannot reduce the viscosity because of the lack of large shear warmth, which makes it difficult to fill the mold.

The nozzle can be not well matched with the inlet of the main runner, as well as the overflow with the mold plus the filling on the mold are often unsatisfactory. The nozzle itself has high flow resistance or is blocked by foreign matter, plastic carbonized deposits, etc .; the spherical surface of the nozzle or the primary runner inlet is damaged or deformed, which affects the good cooperation with the other party; edm Machining faults or deviations cause the nozzle and the main runner axis to have an inclination displacement or the axial pressing surface area to separate; the nozzle ball diameter is certainly larger than the main runner entrance ball diameter, due to the gap at the edge, the nozzle axis gradually increases under the squeeze of this overflow The pushing pressure will cause the plastic gear to be dissatisfied.

(4) The plastic material frit blocks the feeding channel. Because the plastic is normally partially melted and agglomerated in the hopper dryer, or the temperature inside the feed section of the barrel is too high, or the plastic grade is going to be not selected properly, or maybe the plastic contains too much lubricant, the clear plastic will enter the feed port or screw at the reduced diameter position. Premature melting in the deep groove of your screw end, dog-supplier the pellets and the melt are bonded to each other to form a "bridge", which blocks the channel or envelops the screw, and slides circularly with the mess rotation, and cannot move forward, causing interruption of feeding or irregular fluctuations. This situation can only end up being fundamentally resolved after the passage is cut through as well as the material blocks are eliminated.

(5) The nozzle cold material enters the mold. Injection molding machines usually only install straight-through nozzles due to pressure loss. However , if the temp of the front end of the barrel and the nozzle is too large, or there is too much material at the front end of the barrel or clip under high pressure, "salivation" will occur, which will cause the vinyl to accidentally enter the key runner entry before the injection is started and the plastic mold is open. And it becomes hard underneath the cooling effect of the template, which usually prevents the melt from entering the cavity smoothly. At this time, the temperature belonging to the front end within the barrel plus the nozzle should be lowered, the storage capacity for the barrel must be reduced, and the back pressure ought to be reduced to avoid excessive dissolve density at the front end of the barrel.

(6) The treatment cycle is actually short. Due to the short cycle, the material heat is too late to keep up, which will also cause material shortage, especially when the voltage fluctuates greatly. The period should be adjusted accordingly according to the supply voltage. Die Casting Tooling Generally, the injection and holding pressure time are not considered during the adjustment. The main consideration is to adjust the time from the completion of the holding pressure to the return from the screw, which in turn does not affect the filling and molding conditions, and can extend or shorten the preheating time of the pellets in the barrel.

2 . Mould:

(1) The mildew casting system is defective. The flow channel is too small , too thin or perhaps too long, which will increases fluid resistance. The primary runner should increase the size, and the athlete and branch runner needs to be round. The runner and also the mouth is too large, as well as the injection force is inadequate; the jogger and gate are clogged by impurities, foreign matter or carbide; the runner and door are rough with scars, or have sharp angles, plus the surface roughness is poor, which impacts the material circulation;

The athlete does not have a cold slug well or the chilly slug well is too small , and the opening direction is without question wrong; for multi-cavity molds, the jogger and gate size distribution should be carefully arranged, otherwise there will be only the main runner or the thick and short gate. The situation where the cavity can be filled but other cavities cannot be filled. The diameter in the runner need to be increased appropriately to reduce the pressure drop of the burn flowing towards the end with the runner, and the gate on the cavity farther from the main runner should be enlarged to make the injection pressure and materials flow velocity of each tooth cavity basically the same.High Pressure Die Casting & Tooling Services | China Top Die Casting Companies | MINGHE

(2) The mold design is unreasonable. The mold is too complex, with many turns, improper selection of the feed inlet, too narrow runner, limited number of gates or improper form; the partial portion of the product is very thin, the thickness of this entire product or part should be increased, or an auxiliary must be set near the insufficient filling Runner or gate;

It is not uncommon intended for inadequate venting measures inside the cavity to cause dissatisfaction with the parts. This defect mostly occurs in the corners of the item, deep recesses, thin-walled parts surrounded by thick-walled parts, and thin-walled parts formed simply by side entrance. The bottom of your bottom shell, etc .How to use the CNC wire cutting machine reasonably?

The design to eliminate this defect includes opening effective vents, selecting a reasonable door position to help make the air easy to discharge in advance, and when necessary, deliberately making a certain part of the trapped area of the cavity into an insert to make the air escape from your insert. Gap overflow; to get multi-cavity forms that are prone to unbalanced gateway distribution, the number of injection cavities should be decreased if necessary to ensure that other cavity parts are qualified.

3. Process:

(1) Improper give food to adjustment, lack of material or perhaps excessive material. Inaccurate nourishing metering or abnormal feeding control system operation, abnormal injection routine caused by hypodermic injection molding machine or form or operating conditions, low pre-plastic back pressure, or low particle density in the clip or barrel may cause materials shortage. For large particles, Pellets with many voids and plastics with large crystalline specific volume changes, Shalashala Laser Cutting Machine Blogsuch as polyethylene, polypropylene, nylon, etc ., as well as materials with higher viscosity, including ABS, ought to be adjusted to a higher volume. If the temperature belonging to the material is undoubtedly high, the volume should be modified.

When there is certainly too much material at the end within the barrel, the screw will certainly consume extra injection pressure to compress and push the excess stock in the gun barrel during injection, which greatly reduces the effective shot pressure for the plastic entering the mould cavity. The product is hard to fill.

(2) The injections pressure is actually low, the injection time is brief, and the plunger or twist returns too early. Molten plastic has larger viscosity and poor fluidity at lower working temperatures, so it needs to be injected at higher pressure and speed. For example , in the production of ABS color parts, the high temperature resistance of the colorant limits the heating heat range of the barrel, which has to become compensated by simply higher treatment pressure and longer hypodermic injection time than usual.

(3) The injection speed is slow. The injection speed is of great significance for some products with complicated shapes, huge thickness changes, and long processes, as well as plastics with high viscosity, such as toughened ABS. When the product can not be filled with ruthless, high-speed shot of ptj machining parts should be considered to overcome the problem of filling discontentment.

(4) The material temperature is too low. The temperature of the front end from the barrel is low, as well as the viscosity in the molten materials entering the cavity rises too early to the point where it is difficult to flow as a result of cooling a result of the shape, which hinders the filling of the far end; the rear part of the barrel or clip is a plastic with low temperature and substantial viscosity Difficult flow slows the forward movement with the tsmachining screw. As a result, it seems that the pressure displayed by the pressure gauge is sufficient, but the melt actually enters the cavity in low pressure and low speed;

If the nozzle temp is low, it may be that the nozzle is in contact with the cold black mold for a long time throughout the fixed feeding and loses heat, or perhaps the nozzle heating system ring is usually insufficiently heated or has poor contact, resulting in cold, frigidity, frigidness, coldness of the material, which may block the feeding channel on the mold; if the mold does not have cool material Well, with self-locking nozzles and post-feeding procedures, the valve can maintain the necessary temps; the nozzle is too frosty when it is just turned on, and sometimes a flame gun can be used for external heating to accelerate the temperature of this nozzle.dog-company

Four, raw materials:

Plastic has poor fluidity. Plastic Machining Service often uses recycled components, and recycled materials often reflect a tendency to increase viscosity. The experiment pointed out that the unit volume denseness of molecular chain scission generated by oxidative cracking increased, which increased the viscosity of your flow in the barrel and cavity, plus the regenerated scraps promoted the production of more gaseous substances, which caused the injections pressure to get lost. Increased, causing difficulty in filling the mold.https://www.cncmanufacturing.cn/

In order to improve the fluidity of the plastic material, it should be considered to add exterior lubricants just like stearic acid or its salts, preferably silicone oil (viscosity 300~600cm2/s). The addition of lubricants not only improves the fluidity of the clear plastic, but also improves the stability and reduces the air level of resistance of gaseous substances.

Post a Comment

Note: Only a member of this blog may post a comment.

Recent News

[latest][5][recentright]

PTJ RFQ

What Is PTJ?
PTJ adopts flexible manufacturing methods to help our customers to control the product cost but best quality guranteed. Some frequently used machining processes include CNC milling, CNC turning, precision grinding, EDM machining, laser cutting, welding, CNC punching, sheet metal stamping, profile extrusion, die casting, forging, and more. Most of the custom precision cnc machining china parts and plastic machining components we made are related to automation machines, robotics, medical devices, fiber optics, aerospace/aircraft, test and measurement, sensors, telecom components, scientific devices, audio equipments, bicycles, boats, camera, cars, drones, electronic enclosures, front panels, furniture and architecture hardware, lighting, motorcycles, scooters, utv, jeeps, trucks, sports equipments, machinery, music instruments, and so on.
For Surface Finishes
Thanks to our mature supplier management and continuously experience accumulation. Now we have very stable surface finish suppliers to assist us to do different surface finishes with stable and excellent quality. Some Frequently used surface finishes are Anodizing, Oxide, Nickel Plating, Chrome Plating, Gold / Silver Plating, Powder Coating, Zinc Plating, PVD Coating, Passivation, Heat Treatment, Electrochemical machining, Brushing, Polishing, Sandblasting, etc.
General Tolerance of Equipments
1. CNC Milling tolerance: +/-0.01mm
2. CNC turning tolerance: +/-0.01mm
3. Precision grinding tolerance: +/-0.005mm
4. EDM machining tolerance: +/-0.005mm
How to Control Quality?
1. Inspection by machinist himself who is responsible for a specific part machining.
2. First article part inspection by QA.
3. IPQC patrol inspection during production.
4. PQC inspection before shipping according to ISO9001 sampling inspection standard for large quantity production. And for small quantity, 100% full inspection.
5. Material Certificates and outgoing inspection reports could be provided.
Our CNC machine and swiss machining shop sets full and advanced inspection instruments such as CMM, projector, height instrument, industrial microscope, micrometer, calipers, thread gauges, pin gauges, block gauges, etc. so as to inspect all details on drawings and confirm quality is good and issue the ourgoing reports accordingly.
How to Start Working with Our Company?
1) Sending detailed RFQ with 2D and 3D drawings to through email to info@pintejin.com. General drawing formats like PDF/ STEP/IGES/X_T etc are accepted.
2) We check and confirm about materials, surface finish and quantiy, and evaluate. If any question, our sales engineer would double check with customers until everything is clear. We will quote accordingly if we are ok to make the parts with best quality. If no question and everything is clear, we send quotation with best prices within 24 hours. Our sales engineer team is online for 7/24 for offering customers the best cnc machining services.
3) We recommend to start from few pcs prototypes for approval at the beginning. If nothing wrong after customer’s test and approval, then we proceed to volume cnc manufacturing.
Some Tips for Customers
a. We accept Paypal payment of small amount payment for samples or small batch orders for building mutual trust at the beginning. General payment terms is 30% by wire transfer, and balance before shipping.
b. Delivery time for few pcs samples are generally 5 to 7 days, and 15 to 25 days for volume production. If the order quantity was too big, we would check and confirm delivery time sepertely.
c. Our company has concrete promise to all customers that if any quality problem caused by our factory, we would remake all parts for free or send money back.
Safe Packing Methods to Prevent Goods from Damage during Transportation
Due to long distance transportation to overseas countries, safe and strong packing is very important to gurantee the parts to be in good conditions when arriving at customer’s hand. We choose different packing materials according to different parts and quantity. Some commonly used packing materials are pp/bubble bag, oil paper, foam, blister tray, 5 layer carton, wood box, etc. See below some packing pictures.