• Home
  • Introduction to the method of aluminum alloy die casting to solve casting porosity

Introduction to the method of aluminum alloy die casting to solve casting porosity

Method to solve casting porosity

 

First analyze the reasons for the formation of stomata, and then take corresponding measures.

 

(1) Choose dry and clean alloy materials.

 

(2) Do not overheat or degas the melt under control.

 

(3) Reasonably choose the casting process parameters, especially the injection speed. The starting point for speed-regulating high-speed machining.

 

(4) Sequential filling helps to discharge the cavity gas. Pouring I: 1, and the runner has sufficient length. It should be 50 ram, which is conducive to the smooth flow of alloy liquid and gas discharge.

 

The thickness and direction of I:1 can be changed, and overflow grooves and exhaust grooves are set at the holes. The sum of the cross-sectional area of ​​the overflow product is not less than 60% of the sum of the cross-sectional area of ​​the gate part, otherwise the slag discharge effect will be poor.

 

(5) Choose good performance paint and spray volume control.

 

Choose the right die casting machine

 

 

 

Die-casting machine is the key equipment for die-casting production, and its performance objectively determines the quality of die-casting parts. The correct choice of die-casting machine is essential to ensure product quality, improve production efficiency and reduce production costs. The performance of the die casting machine depends on two aspects.

 

Sufficient clamping force: to prevent the flow pressure of the molten metal from reaching high peaks, and to prevent flashing and flying materials.

 

Sufficient injection capacity: to ensure that the stand casting process will not cause overheating or a large amount of overflow of the mold, and at the same time ensure that the machine has enough capacity to transport enough molten metal and fill the cavity as required to accelerate the speed in a short time.

 

Design of Die Casting Mould Runner

 

Because the zinc alloy must fill the cavity in a short time, the design and manufacturing of the die-casting mold and its runner system are much higher than that of the plastic mold.

 

The runner system guides the metal solution to fill the cavity in some way. It plays an important role in the flow direction of the metal liquid, pressure transmission, filling time, exhaust conditions and mold temperature distribution.

 

It is also an important factor that determines the quality of die castings.

 

The design principle of the die-casting mold runner system should be summarized from the gooseneck to the gate to avoid sharp corners, and the runner surface should be smooth to reduce resistance and maintain the flow rate of the liquid zinc alloy.


Post a Comment

Note: Only a member of this blog may post a comment.

Recent News

[latest][5][recentright]

PTJ RFQ

What Is PTJ?
PTJ adopts flexible manufacturing methods to help our customers to control the product cost but best quality guranteed. Some frequently used machining processes include CNC milling, CNC turning, precision grinding, EDM machining, laser cutting, welding, CNC punching, sheet metal stamping, profile extrusion, die casting, forging, and more. Most of the custom precision cnc machining china parts and plastic machining components we made are related to automation machines, robotics, medical devices, fiber optics, aerospace/aircraft, test and measurement, sensors, telecom components, scientific devices, audio equipments, bicycles, boats, camera, cars, drones, electronic enclosures, front panels, furniture and architecture hardware, lighting, motorcycles, scooters, utv, jeeps, trucks, sports equipments, machinery, music instruments, and so on.
For Surface Finishes
Thanks to our mature supplier management and continuously experience accumulation. Now we have very stable surface finish suppliers to assist us to do different surface finishes with stable and excellent quality. Some Frequently used surface finishes are Anodizing, Oxide, Nickel Plating, Chrome Plating, Gold / Silver Plating, Powder Coating, Zinc Plating, PVD Coating, Passivation, Heat Treatment, Electrochemical machining, Brushing, Polishing, Sandblasting, etc.
General Tolerance of Equipments
1. CNC Milling tolerance: +/-0.01mm
2. CNC turning tolerance: +/-0.01mm
3. Precision grinding tolerance: +/-0.005mm
4. EDM machining tolerance: +/-0.005mm
How to Control Quality?
1. Inspection by machinist himself who is responsible for a specific part machining.
2. First article part inspection by QA.
3. IPQC patrol inspection during production.
4. PQC inspection before shipping according to ISO9001 sampling inspection standard for large quantity production. And for small quantity, 100% full inspection.
5. Material Certificates and outgoing inspection reports could be provided.
Our CNC machine and swiss machining shop sets full and advanced inspection instruments such as CMM, projector, height instrument, industrial microscope, micrometer, calipers, thread gauges, pin gauges, block gauges, etc. so as to inspect all details on drawings and confirm quality is good and issue the ourgoing reports accordingly.
How to Start Working with Our Company?
1) Sending detailed RFQ with 2D and 3D drawings to through email to info@pintejin.com. General drawing formats like PDF/ STEP/IGES/X_T etc are accepted.
2) We check and confirm about materials, surface finish and quantiy, and evaluate. If any question, our sales engineer would double check with customers until everything is clear. We will quote accordingly if we are ok to make the parts with best quality. If no question and everything is clear, we send quotation with best prices within 24 hours. Our sales engineer team is online for 7/24 for offering customers the best cnc machining services.
3) We recommend to start from few pcs prototypes for approval at the beginning. If nothing wrong after customer’s test and approval, then we proceed to volume cnc manufacturing.
Some Tips for Customers
a. We accept Paypal payment of small amount payment for samples or small batch orders for building mutual trust at the beginning. General payment terms is 30% by wire transfer, and balance before shipping.
b. Delivery time for few pcs samples are generally 5 to 7 days, and 15 to 25 days for volume production. If the order quantity was too big, we would check and confirm delivery time sepertely.
c. Our company has concrete promise to all customers that if any quality problem caused by our factory, we would remake all parts for free or send money back.
Safe Packing Methods to Prevent Goods from Damage during Transportation
Due to long distance transportation to overseas countries, safe and strong packing is very important to gurantee the parts to be in good conditions when arriving at customer’s hand. We choose different packing materials according to different parts and quantity. Some commonly used packing materials are pp/bubble bag, oil paper, foam, blister tray, 5 layer carton, wood box, etc. See below some packing pictures.